Bagnall 3050 10 year OverhaulRustenberg Platinum Mines No. 4
|
| 19/11/00 Work on stripping Gelerts boiler has now started, these are some of the latest photos |
|
|
|
|
|
|
|
|
||
| 9/12/00 The boiler has now been removed from the frames. |
|
|
|
|
||
| Christmas 2000, and the tubes have been removed, and work started in removing the faulty stays. |
|
|
|
|
|
Click here for the movie image |
| The old boiler tubes. |
|
|
| At the same time, Gelerts Sister loco, Bagnal 3023, has its boiler readied for the boiler inspector. |
|
|
| April, and now all the faulty stays, including all the ones installed by 'Winsons', have been removed. |
|
|
|
|
||
| Dave Ruston Works on the boiler, stored behind the frames. |
|
|
|
|
||
Click here for Part 2 |
||